top of page

ABOUT ME (cont.)

DRAGADOS OFFSHORE MEXICO.

EPCO Offshore Structures Transportation and Installation Projects

 

Contract Administrator (T&I)

(+)2  YEARS  POSITION

 

Most Important Projects:

  • CA-KU-A1

Most Important Activities:

  • Subcontracts Administrator for T&I.

  • Milestones notification.

  • Prevention and mitigation actions during different operations.

  • Liaised between Insurance, vendors, contractors, and MWS.

  • Vessels Logistics at the yard for arrival, structures loadout and sail away, as well as cleaning operations and hand back.

  • Estimations Review and Approval.

I have had the opportunity to be Hired and Advising to important Companies with experience in the Oil and Gas Industry.
Domsa 200x115

SAIPEM AMERICA INC.

Offshore Structures Transportation and Installation Projects

 

Project Engineer

(+)6  YEARS  POSITION

 

Most Important Projects:

  • CB-Litoral-A Float Over T&I

  • CA-Litoral-A Float Over T&I

  • Kuil-A, Maloob-D, Tsimin-A & Tsimin-B T&I

  • Mad Dog Drilling Rig Replacement T&I

  • Tahiti 2 WIM T&I

  • HA-LT-01 Platform T&I

 

Most Important Activities:

  • Interface Project Coordinator

  • Post Order / Logistics Interface Coordinator

  • Structure Lead

  • Project Engineer

  • Engineer

OPERADORA CICSA @ SWECOMEX

Onshore / Offshore Structures EPC Projects

Group Leader Civil Structural Department

(+)5  YEARS  POSITION

Most Important Projects:

  • Ethylene & Oxide Plant Expansion 1st Stage.

  • JACK UP JU-2000E Construction.

  • Quarter Module Removal at Field            HA-AJ-01.

  • Production Platform PB-KU-M, Construction, Transportation & Installation.

  • Drilling Platforms “Maloob-A, Maloob-B & Manik-A, Construction, Transportation & Installation.

 

Most Important Activities:

  • Group Lead Civil/Structural Department for Different Projects

INSTITUTO MEXICANO DEL PETROLEO

Offshore Structures Research, FEED and Structures Maintenance.

 

Structural Engineer

(+)8  YEARS  POSITION

 

Most Important Projects:

  • Different Platforms in the GoM for PEMEX Scopes.

Most Important Activities:

  • Engineering for Maintenance to different PEMEX Platforms in the GoM.
    Design Bases and Bids Preparation for Pemex Projects.
    Structural Engineering during different stages as Pemex Advisor.
    Participation during the drafts of PEMEX Norms and Specifications.

VIGEN S.A de C.V.

Onshore / Offshore Structures

FEED / Counseling Company

 

Group Leader Civil Structural Department

Project:

     Batería "Terra" Design and Construction Assistance.

 

TECHNIP SERVICIOS DE MEXICO.

Onshore Structures

EPC Projects

 

Civil Structural Discipline Lead

Projects:

     120 MMSCFD Hydrogen Plant Garyville, LA  (Claremont, CA)

     Valero Port Arthur Crude Expansion Phase II  (Houston, TX)​

bottom of page